Quality assurance is what you do before a problem exists; quality control is how you catch it when it does. Most procurement disputes trace back to neither being properly defined at the start of the contract.
Inspection test plans that actually get used
We write ITPs that identify the real risk points in your supply, not a generic template. Each line states the activity, the reference document, the acceptance criteria, and who attends: review, witness, hold or surveillance.
The documentation package is part of the product
On most industrial contracts the manufacturing record book is a deliverable in its own right, and an incomplete one delays acceptance as surely as a defective weld. We compile and review the MRB against the contract requirement as the work proceeds, not at the end.
Scope of work
- Risk-based inspection test plan (ITP) development
- Hold, witness, review and surveillance point management
- Dry film coating thickness and surface preparation assessment
- Surface roughness (Ra / Rz) measurement against specification
- Functional testing: valve seat leakage, hysteresis, stroke timing
- Manufacturing record book (MRB) compilation and review
Request this service
Tell us the item, the applicable standard and the location. We confirm scope, inspector and price within one working day.
Standards referenced
- Quality managementISO 9001:2015
- Coating thicknessISO 2808
- Surface textureISO 4287 / ISO 21920
- Valve testingISO 5208 / EN 12266
Direct line
Coverage
Berlin / Brandenburg, nationwide Germany, EU and worldwide on request.
Quality, Audit & Compliance
Systems, audits and documentation that stand up to scrutiny.

Technical Auditing
Independent audit of technical capability, process control and compliance — at a supplier, a subcontracto…

Supply Chain & Cargo Inspection
Loading supervision, cargo condition survey and quantity verification for logistics, trade and project ca…

Certification & Management Systems
Gap assessment, internal audits and audit preparation for ISO 9001, ISO 14001 and ISO 45001 certification…
Get a scoped quote within one working day.
Reports signed by the inspector who was on site, issued in German or English within 48 hours.
