A welder certificate proves the welder was competent under test conditions on a particular day. It does not prove that this weld, on this joint, meets the acceptance criteria of your specification. Only inspection does that.
Before the arc is struck
We review the welding procedure specification and its supporting procedure qualification record, verify that welder qualifications are valid and actually cover the joint configuration in production, and confirm consumable control, material traceability, joint preparation and preheat requirements.
Independent of the fabricator
Our inspectors work independently of the shop, so there is no tension between getting the job finished and getting it finished correctly. Non-conformances are raised the day they are found, not batched into a final report when the schedule has already moved on.
Scope of work
- Visual weld inspection (VT) to ISO 17637 / ISO 5817 acceptance levels
- WPS and PQR technical review for range of qualification
- Welder qualification (ISO 9606) validity and continuity checks
- Fit-up and joint preparation checks before welding
- Weld gauge measurement: throat, leg, cap height, undercut, misalignment
- EN 1090 execution class verification and factory production control support
Request this service
Tell us the item, the applicable standard and the location. We confirm scope, inspector and price within one working day.
Standards referenced
- Welding quality requirementsISO 3834
- Execution of steel structuresEN 1090
- Weld acceptance criteriaISO 5817
- Welder qualificationISO 9606
- Procedure qualificationISO 15614
Direct line
Coverage
Berlin / Brandenburg, nationwide Germany, EU and worldwide on request.
NDT & Asset Integrity
Finding what a visual check cannot — in welds, vessels, tanks and piping.

Non-Destructive Testing (NDT)
UT, MT, PT, RT, VT and leak testing by ISO 9712-qualified technicians, with the method matched to the def…

Corrosion & Erosion Assessment
Wall thickness mapping, coating condition assessment and remaining-life input for in-service equipment.…

API Tank Inspection
Above-ground storage tank inspection aligned to API 653 principles — shell, floor, roof and appurtenance …
Get a scoped quote within one working day.
Reports signed by the inspector who was on site, issued in German or English within 48 hours.