A supplier audit before award costs a fraction of a rejection after delivery. The purpose is not to find fault — it is to establish, on evidence, whether this supplier can actually deliver what your specification demands, with the equipment and people they actually have.
What an assessment actually establishes
Quality management system maturity and whether it is genuinely operated; calibration and equipment control; welder and NDT personnel qualification validity; material traceability practice; sub-supplier control; and how previous non-conformities were handled — which is usually the most revealing area.
Reported so you can decide
You receive a structured report with findings ranked by risk, evidence for each, and a clear recommendation: approved, approved with conditions, or not recommended. Where conditions apply, we state exactly what must be demonstrated before award.
Scope of work
- Pre-award capability and capacity assessment
- Quality management system evaluation
- Calibration, equipment and measurement control review
- Personnel qualification verification (welders, NDT, inspectors)
- Material traceability and sub-supplier control review
- Risk-ranked report with award recommendation
Request this service
Tell us the item, the applicable standard and the location. We confirm scope, inspector and price within one working day.
Standards referenced
- Quality managementISO 9001:2015
- Auditing management systemsISO 19011
- Welding quality requirementsISO 3834
Direct line
Coverage
Berlin / Brandenburg, nationwide Germany, EU and worldwide on request.
Third-Party Inspection & Expediting
Independent verification of what your supplier is building, before it ships.

Second & Third Party Inspection
Independent verification on your behalf at the supplier's works — or on the supplier's behalf against the…

Vendor Inspection & Expediting
Inspection and progress expediting inside European factories for buyers sourcing equipment from Germany a…

Pre-Shipment Inspection
Final verification of quantity, condition, marking and packing before goods leave the supplier — the last…
Get a scoped quote within one working day.
Reports signed by the inspector who was on site, issued in German or English within 48 hours.